HYDROFOOD PACKING STATION
Mexico / Agro-Industry
Hot
Agro-Industry
Clear panels integrated into design
About The Hydrofood Packing Station Project
Hydrofood’s 8700 Sqm Packaging center structure, engineered and constructed by Agrotop, processes 25kg/Sqm of fruits & vegetables from the 20 hectars (200,000 Sqm) of surrounding greenhouses.
The packing station structure for the Hydrofood company, engineered and constructed by Agrotop, is Hydrofood’s main center for fruits and vegetables packing, storing and shipping. At 145 x 60 meters, or 8,700 sqm – It processes 25Kg/Sqm of produce per day from the 20 Hectars (200,000 Sqm) of surrounding greenhouses.
Agrotop decided to use only panels, a high quality material, when engineering the structure, but chose a simple build design to keep construction costs low. Clear panels were integrated into the design at key locations to allow natural sunlight to enter the structure thus saving electricity costs during the operational stage.
Agrotop partnered with “Netafim” company that installed the heavy duty systems during the structure erection, coordinating the construction together in order to successfully meet the operation deadline.
Project by the numbers
Solutions we used
Hydrofood Packing station / a Look From The Inside
What our Clients say about us
“I would like to point out Agrotop’s professional engineering, precise production and ability to work under very strict time constraints without reducing the quality of their products.”
“The high quality job done by Agrotop led to almost maintenance free projects. We did not have to spend extra money on maintenance during these years. Today, buildings that are 12 years old look like they are brand new.”
“Together with Agrotop we constructed broiler and layer projects for millions of birds in UK, Spain, Australia, The Emirates, Israel and many other countries.”