MA’ALE GAMLA

Israel / Agro-Industry

Very Hot

Agro-Industry

Full Turn-Key Project

About The Ma’ale Gamla Project

A new project has been completed in Ma’ale Gamla, Israel

Agrotop recently completed the construction of a new broiler farm in Ma’ale Gamla, featuring 3 double poultry houses with a total capacity of approximately 180,000 birds.

The project was designed and built using Agrotop’s unique ventilation concept, combining MagFan fans and dampers to create efficient and uniform airflow throughout the houses.

This farm joins a growing line of projects that combine engineering planning, precise execution, and solutions tailored to the grower’s operational needs and local climate conditions.

We thank our customers for their trust and wish them great success as the houses are populated and the farm begins its ongoing operation.

Building or upgrading poultry houses?
Don’t wait. Talk to the Agrotop team before your next project.

Project by the numbers

0
Birds
0
°C Summer Temperature
0
Year Built

Solutions we used

  • Engineering

  • Technology Integration

  • Turn-Key

Ma’ale Gamla / a Look From The Inside

What our Clients say about us

Related Projects

DTK

Vietnam / Layer Houses

Cantos Blancos

Spain / Alternative Free Range Houses

Chirina Hatchery

Georgia / Agro-Industry

Gliksman

Israel / Layer Houses

Hydrofood Packing station

Mexico / Agro-Industry

Novel and La Pardilla

Spain / Piggeries